Jeffrey Road Grade Separation

Irvine, CA

This $34.8 million project included excavation for railroad grade separation, structural steel railroad bridge and post tension concrete pedestrian overcrossing. Scope also included stormwater drainage pump station, reinforced concrete retaining walls, road widening, utility relocations and landscaping.

Back to Projects