A major participant for Edward Kraemer Sons, this $11.4 million project is a design-build project which includes four miles of full roadway reconstruction, underground utility infrastructure, 12 new bridge structures and one new 10×8 double barrel box culvert. SEMA’s scope includes removals of all existing pavement surfaces and drainage as well as: 13,500 LF removal of median barrier, installation of 18,000 LF RCP pipe, removal and replacement of 240 LF 44″ sanitary sewer line, 246,000 CY excavation and embankment, and 63,000 TN aggregate base course. SEMA’s scope also includes excavation for temporary and permanent walls, bridge abutments and columns, rip rap placement and detour construction.

This project has been awarded the Gold Safety Award from Liberty Mutual. 