The project was located at the SH 133 and SH 82 interchange. This project consisted of roadway and bridge widening, retaining wall, utilities, sidewalks, signals, pavement marking and traffic control over the Roaring Fork River.
Back to ProjectsThe project was located at the SH 133 and SH 82 interchange. This project consisted of roadway and bridge widening, retaining wall, utilities, sidewalks, signals, pavement marking and traffic control over the Roaring Fork River.
Back to Projects