This project included modifications to the existing Colorado River Bridge on County Road V.5 (Roan Creek Road) south of DeBeque. Construction included removal of the 4 south concrete bridge spans, 3 piers and 1 abutment, and replacement of the spans with 1 pier, 1 abutment and steel plate girders. The entire bridge deck was replaced and one additional girder line was added to the entire structure.
Back to Projects