The purpose of this $13.6 million project is to improve safety and relieve traffic congestion along Pineda Causeway by removing the existing at grade FEC railroad crossing with the Pineda Causeway. Project scope includes the construction of a grade separated overpass over the Florida East Coast Railway (FEC). This project is approximately 0.5 mile long, and occurs between North Wickham Road and SR 5/US 1 interchange with Pineda Causeway (near Melbourne, FL).
Back to Projects