This project consists of rehabilitating the degrading components of the bridge superstructure. This will include replacing the asphalt overlay and waterproofing membrane, repairing damage to the concrete deck, sidewalk and soffit, and replacing the missing expansion joint cover along the sidewalk.
Back to Projects