This project consists of construction of the subgrade, drainage structures and associated work for that portion of BNSF’s proposed Big Lift Landing Track Project. The Project work tasks shall include, but not be limited to: stormwater management, clearing and grubbing, excavation and embankments, subballast, drainage structures, retaining walls, seeding, utility coordination and other miscellaneous work.
(subcontractor to IHC)
This project consists of furnishing and installing the precast pile scope of work for the site underpass.
SEMA Participates in a $3 Billion Infrastructure Project at Orlando International Airport!
The major work items of this project include pavement, removal, earthwork, installation of MSE wall, utility adjustments, installation of reinforced concrete pipe, fly ash treated subgrade, crushed aggregate base course, asphalt paving, underdrain system, installation of lights and signs, topsoiling and seeding.
This project included earthwork and storm drainage improvements for a taxiway extension, safety area improvements and grading for commercial hangar pads.
Owner Testimonial Letter
This project includes fabrication and installation of seismic retrofits to strengthen four bridge structures that compose the JWA elevated roadway and associated structures.
This project included the construction of a detention pond at the Colorado Springs Airport, which included 125,000 CY of excavation, construction of new riprap outfall structures, installation of 96 96-foot long 6 x 6 double box culvert, and construction of a new roadway.
This project was located at the Rocky Mountain Metropolitan Airport in Broomfield. Scope for the project included earthwork, retaining walls and enhanced taxiway centerlines.