This $16.8 million design-build project included the demolition of the existing reservoir and constructing 2 buried reservoirs with adjoining booster pump stations and connecting pipelines for a combined capacity of 9 MG.
Back to ProjectsThis $16.8 million design-build project included the demolition of the existing reservoir and constructing 2 buried reservoirs with adjoining booster pump stations and connecting pipelines for a combined capacity of 9 MG.
Back to Projects