This $29 million modified design-build interchange improvement project was located at US 160 and US 550 near Durango, Colorado. The project consisted of completing a four-lane section of US 160 through Farmington Hill, construction of a three-lane interchange, excavation, retaining walls, precast panels, ramps, part of the 550 mainline and four new bridges.
Owner Testimonial Letter – US 160
Back to Projects