RTE 5 BMP’s & Retaining Walls

Gorman, CA

This project includes excavation of ditches, placing of permanent materials, and constructing retaining walls on State Highway 5 from 0.4 mile South of Smokey Bear Road undercrossing to 0.3 mile South of Route 5/138 separation. Other items of work include street sweeping, roadway, structure and ditch excavation with ADL, erosion control, HMA, rubberized HMA, placement of AC dike, structural concrete drainage, 24” pipe culvert, removal of existing headwall and culvert.

Back to Projects