This project includes all labor, materials, and equipment for the ANTERO DAM REHABILITATION PHASE III including the following major components: Site mobilization and demobilization, construction of soil-bentonite barrier wall into the foundation through the dam embankment, excavation and placement of embankment material, excavation, stockpiling, and placement of riprap and riprap bedding, modifying existing instrumentation, erosion and sediment control, borrow development, wetland and reservoir protection, and maintain communication system continuity.